Zebra Mussels Halt Work on St. Croix Bridge

By: Associated Press Email
By: Associated Press Email

STILLWATER, Minn. (AP) -- Work on the new St. Croix bridge connecting Minnesota and Wisconsin has been halted after dead zebra mussels were found on six construction barges headed for the river.

The Minnesota Department of Natural Resources is investigating the incident. DNR spokesman Chris Niskanen says none of the barges entered the St. Croix river.

Contractor Ed Kraemer & Sons of Plain, Wis., agreed to decontaminate all construction barges. Niskanen says the company properly treated the hulls with 190-degree water, but failed to scrape the hulls.
Inspectors noticed the zebra mussels on the barges at the construction staging area this week and contacted the DNR. Kraemer spokesman Bob Beckel tells the St. Paul Pioneer Press the company will make sure it doesn't happen again.

Kraemer trucked the barges from the Fox River in Oshkosh and from Milwaukee.


Join the Conversation!

To comment, the following rules must be followed:

  • No Obscenity, Profanity, Vulgarity, Racism or Violent Descriptions
  • No Negative Community Comparisons
  • No Fighting, Name-calling, or Personal Attacks
  • Multiple Accounts are Not Allowed
  • Stay on Story Topic

Comments may be monitored for inappropriate content, but the station is under no legal obligation to do so.
If you believe a comment violates the above rules, please use the Flagging Tool to alert a Moderator.
Flagging does not guarantee removal.

Multiple violations may result in account suspension.
Decisions to suspend or unsuspend accounts are made by Station Moderators.
Questions may be sent to comments@wsaw.com.
Please provide detailed information.
All comments must adhere to the WSAW.com discussion rules.

powered by Disqus
WSAW-TV 1114 Grand Ave. Wausau, WI 54403
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 205956331 - wsaw.com/a?a=205956331