St. Croix Bridge Work Relying A Lot on Local Labor

By: Associated Press Email
By: Associated Press Email

STILLWATER, Minn. (AP) -- The construction of the new St. Croix River bridge is relying heavily on local labor, a strategy that officials say keeps money in the community and takes advantage of well-established relationships.

Steel will be installed by a contractor in Hudson, Wisconsin and painting will be done by a New Hope-based business.

The bridge project includes a new span across the river between Oak Park Heights, Minnesota and St. Joseph, Wisconsin. It's scheduled to be complete in 2016.

Jon Chiglo is a project director with the Minnesota Department of Transportation. He says using local laborers makes sense because they're familiar with the environment in which they're working. They also already have relationships established with the other subcontractors.


Join the Conversation!

To comment, the following rules must be followed:

  • No Obscenity, Profanity, Vulgarity, Racism or Violent Descriptions
  • No Negative Community Comparisons
  • No Fighting, Name-calling, or Personal Attacks
  • Multiple Accounts are Not Allowed
  • Stay on Story Topic

Comments may be monitored for inappropriate content, but the station is under no legal obligation to do so.
If you believe a comment violates the above rules, please use the Flagging Tool to alert a Moderator.
Flagging does not guarantee removal.

Multiple violations may result in account suspension.
Decisions to suspend or unsuspend accounts are made by Station Moderators.
Questions may be sent to comments@wsaw.com.
Please provide detailed information.
All comments must adhere to the WSAW.com discussion rules.

powered by Disqus
WSAW-TV 1114 Grand Ave. Wausau, WI 54403
Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 246800221 - wsaw.com/a?a=246800221
Gray Television, Inc.